Saturday, April 2, 2011

Winter home update

Yesterday we received an update about our winter home construction, seems they are about a week ahead of schedule already. We will drive back to do a walk through inspection after they rough in the plumbing and electric but before the dry wall goes on; that should be around April 20th.  We had our sales person take some photos for us.

 

The roof trusses are up and some of the roof is on now. This is the west wall, the large window is for the den and the small high one is the master bathroom.

 

The garage faces north, the door in the rear of the garage enters the laundry room.

 

From left: the window looks into the guest suite, the front door looking through the great room to the back of the house, the small garage door is for a golf cart.

 

The east wall; the small high window is the guest bathroom and the large window near the back of the house is the dining area.

 

Inside the great room, the arched doorway to the right is the front entryway. To the left (behind the sheet of plywood), is the master walk-in closet, at extreme left part of the master bath window is visible and to the right of the plywood is the den, it’s window is visible.

 

The rear patio with a patio door into the dining area of the great room and a window that also looks into the great room. The roof appears to be well underway.

No comments: